685 La Trobe St Docklands

Piletest undertook High Strain Dynamic Load Testing using the PDA on 30 metre deep CFA piles in the Docklands. Utilising a 20t drop hammer, Piletest was able to confirm pile capacity and verify required design lengths.

Previous
Previous

Marlborough Road Bridge Rehabilitations

Next
Next

Riverslea Project